FROM THE COMMUNITY COLLECTION
Dark Tunnel: Stage 4
Now for the Ventilation System. As you can see, the material is a brushed aluminum and the vents are custom modeled 45 deg bidirectional louvers. Now that I think about it I should add a seam between the vents. One solid duct doesn't quite look right. I rendered this one at superfine 64 to help define the treads in the hanger rods, which I think I made a bit too 'tight', but that's ok. They still look good. ;-) I hope you all don't mind that I'm posting with each major addition to the image. When I started this project I wasn't this serious about it. Now my diligence has grown to almost obsessive levels. I find myself working towards a design masterpiece to rival the astounding work some of you have done here. I have to admit I'm astounding myself with the detail I'm working into this image and the cleverness with which I've done some of it. Not that I'm not proud of the abstract work I've done but I feel a special and intense pride for my accomplishment with this image. Like when I did ?Temple of Golden Light?, which was easy compared to this one, I feel I?m truly creating a masterpiece. I hope you all like it the way I do. ;-) All comments are welcome and appreciated.

Comments (0)
Sign in to join the conversation.
No comments yet. Be the first to leave a thought.